Declared possession date passed 58 months ago and completion is not recorded in the register: ask the builder for the completion / occupancy certificate.
स्कोर 64/100 · विश्वास MEDIUM
RERA ताबा
Jun 2021
नवीनतम ताबा
Dec 2021
विकलेली युनिट्स
जाहीर नाही
स्थिती
Registered
पत्ता
Project Name: “Jubilee Residences” - Construction of Block ‘A’ – Stilt floor + First floor to 4 floors with 50 dwellings totalling 200 dwellings units; Block ‘B’ - Stilt floor + First floor to 4 floors with 24 dwellings totalling 96 dwellings units; Block ‘C’ – Stilt floor + First floor to 4 floors with 23 dwellings totalling 92 dwellings units; Block ‘D’ – Stilt floor + First floor to 4 floors with 27 dwellings totalling 108 dwellings units; Block ‘E’ – Stilt floor + First floor to 4 floors with 23 dwellings totalling 92 dwellings units; Block ‘F’ – Stilt floor + First floor to 4 floors with 34 dwellings totalling 136 dwellings units; Block ‘G’ – Stilt floor + First floor to 4 floors with 34 dwellings totalling 136 dwellings units; Block ‘H’ – Stilt floor + First floor to 4 floors with 40 dwellings totalling 160 dwellings units comprised in S.Nos.117/1D, 1E, 1F, 122/1A, 1B, 1C, 1D, 1E, , Tamil Nadu
TNRERA वरील ताब्याची नवीनतम तारीख Dec 2021 आहे (31 Oct 2026 रोजी तपासले). बिल्डरने त्यानंतर नवीन मुदतवाढ घेतलेली नाही, म्हणजे प्रकल्प स्वतःच्या जाहीर तारखेपेक्षा मागे आहे.