Declared possession date passed 16 months ago and completion is not recorded in the register: ask the builder for the completion / occupancy certificate.
स्कोर 28/100 · विश्वास MEDIUM
RERA ताबा
Dec 2021
नवीनतम ताबा
Jun 2025
विकलेली युनिट्स
जाहीर नाही
स्थिती
Registered
पत्ता
Construction of Phase-I – Block ‘D’ – Tower-I – Stilt floor + First floor-cum-Podium level + 2nd Floor to 9th Floor with 6 dwelling in each floor totalling 54 dwelling units. Tower – II – Stilt floor + First floor-cum-Podium level + 2nd Floor to 9th Floor with 3 dwelling in each floor totalling 27 dwelling units. Block ‘E’ – Tower – I - Stilt floor + First floor-cum-Podium level + 2nd Floor to 9th Floor with 6 dwelling in each floor totalling 54 dwelling units. Tower – II - Stilt floor + First floor-cum-Podium level + 2nd Floor to 9th Floor with 3 dwelling in each floor totalling 27 dwelling units. Individual Villa ‘B’ Type Block of 9 Nos. with Ground Floor + First Floor of 4 dwelling unit in each block, Block – A – Tower – I – Stilt floor + First floor-cum-Podium level + 2nd Floor to 9th Floor with 6 dwelling in each floor totalling 54 dwelling units. Block – B – Tower – I - Stilt floor, Tamil Nadu
TNRERA वरील ताब्याची नवीनतम तारीख Jun 2025 आहे (31 Oct 2026 रोजी तपासले). बिल्डरने त्यानंतर नवीन मुदतवाढ घेतलेली नाही, म्हणजे प्रकल्प स्वतःच्या जाहीर तारखेपेक्षा मागे आहे.